Enterasys Matrix-V V2H124-24 Installation Guide Page 15

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 14
2-1
Chapter 2:
Installing the Redundant Power Supply
Installation
Note: The VSER-RPU-SYS is compatible with V2H124-24 and V2H124-24T only.
The RPS may be placed on a desktop or mounted in a rack.
Caution: DO NOT place the RPS on the floor as the case is not waterproof. It is
recommended that this RPS be installed in a network equipment rack.
Selecting a Site
RPS units can be mounted in a standard 19-inch equipment rack or on a flat surface.
Be sure to follow the guidelines below when choosing a location.
The site should:
be at the center of all the devices you want to link and near a power outlet.
be able to maintain its temperature within 0 to 40 °C (32 to 104 °F) and its
humidity within 5% to 95%, non-condensing
provide adequate space (approximately two inches) on all sides for proper air
flow
be accessible for installing, cabling and maintaining the devices
allow the status LEDs to be clearly visible
Make sure that a separate grounded power outlet that provides 100 to 240
VAC, 50-60 Hz, is within 2.44 m (8 feet) of each device and is powered from an
independent circuit breaker. As with any equipment, using a filter or surge
suppressor is recommended.
Equipment Checklist
After unpacking the RPS, check the contents to be sure you have received all the
components. Then, before beginning the installation, be sure you have all other
necessary installation equipment.
Page view 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 27 28

Comments to this Manuals

No comments