Enterasys 5C105 Installation Guide Page 67

  • Download
  • Add to my manuals
  • Print
  • Page
    / 78
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 66
Mode Switch Bank Settings B-1
B
Mode Switch Bank Settings
This appendix covers the following items:
Required tools (Section B.1)
Locations, functions, and settings for the mode switches (Section B.2)
B.1 REQUIRED TOOLS
Use the following tools to perform the procedures provided in this appendix:
Antistatic wrist strap
Phillips screwdriver
CAUTION: An antistatic wrist strap is required (provided with the module) to perform
the procedures in this appendix. Use the antistatic wrist strap when performing any of
the procedures in this appendix to minimize ESD damage to the devices involved.
Page view 66
1 2 ... 62 63 64 65 66 67 68 69 70 71 72 ... 77 78

Comments to this Manuals

No comments