Enterasys Matrix 7H4385-49 Installation Guide Page 1

Browse online or download Installation Guide for Network switches Enterasys Matrix 7H4385-49. Enterasys Matrix 7H4385-49 Installation guide User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 66
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
8.5x11-inch cover with bleed on 4 sides
Enterasys Matrix
®
DFE-Platinum Series
Hardware Installation Guide
7G4202-72
7G4282-49
P/N 9034095-03
Page view 0
1 2 3 4 5 6 ... 65 66

Summary of Contents

Page 1 - Enterasys Matrix

8.5x11-inch cover with bleed on 4 sidesEnterasys Matrix®DFE-Platinum SeriesHardware Installation Guide7G4202-727G4282-49P/N 9034095-03

Page 2

viii8. AUDITRIGHTS. YouherebyacknowledgethattheintellectualpropertyrightsassociatedwiththeProgramareofcriticalvaluetoEnterasys,and,

Page 3

ixContentsAbout This GuideWho Should Use This Guide ...

Page 4

x Chapter 4: TroubleshootingUsing LANVIEW ...

Page 5 - orcontactEnterasys

DFE-Platinum Series Hardware Installation Guide xiAbout This GuideThisguideprovidesanoverview,installationandtroubleshootinginstructions,and

Page 6 - Circuit Breakers)

How to Use This Guidexii About This GuideHow to Use This GuideReadthroughthisguidecompletelytofamiliarizeyourselfwithitscontentsandtogain

Page 7 - Class 1 Laser Transceivers

Conventions Used in This GuideDFE-Platinum Series Hardware Installation Guide xiiiConventions Used in This GuideThefollowingconventionsareusedin

Page 8 - Declaration of Conformity

Getting Helpxiv About This Guide•Thedevicehistory(forexample,haveyoureturnedthedevicebefore,isthisarecurringproblem)•AnypreviousRetur

Page 9

DFE-Platinum Series Hardware Installation Guide 1-11IntroductionThischapterprovidesanoverviewoftheDFE‐Platinummodulecapabilities,andintrodu

Page 10

DFE-Platinum Modules1-2 IntroductionDFE-Platinum ModulesThissectionprovidesanoverviewofDFEmodules7G4202‐72and7G4282‐49(Figure 1‐1).Eachof

Page 11 - Contents

DFE-Platinum ModulesDFE-Platinum Series Hardware Installation Guide 1-3Figure 1-1 7G4202-72 and 7G4282-49 ModulesNetwork Expansion Module (NEM) Optio

Page 13 - About This Guide

Connectivity1-4 IntroductionConnectivity7G4202-72The7G4202‐72has10BASE‐T/100BASE‐TX/1000BASE‐Tcompliantportsthrough72,fixedRJ45frontpanelc

Page 14 - Related Documents

Standards CompatibilityDFE-Platinum Series Hardware Installation Guide 1-5•NetworkServicesarelogicalgroupsofClassificationRules thatidentify

Page 15 - Getting Help

LANVIEW Diagnostic LEDs1-6 Introduction

Page 16

DFE-Platinum Series Hardware Installation Guide 2-12Network RequirementsThischapterprovidesinformationconcerningthenetworkrequirementsthatmus

Page 17 - Introduction

10BASE-T Network2-2 Network Requirements10BASE-T Network Whenconnectinga10BASE‐Tsegmenttoanyofthefixedfrontpanelportsofthe7G4202‐72or

Page 18 - DFE-Platinum Modules

DFE-Platinum Series Hardware Installation Guide 3-13InstallationThischapterprovidestheinstructionstoinstallthe7G4202‐72and7G4282‐49DFE‐Plat

Page 19

Unpacking the DFE-Platinum Module3-2 InstallationUnpacking the DFE-Platinum ModuleUnpacktheDFE‐Platinummoduleasfollows:1. Opentheboxandremove

Page 20 - Connectivity

Backplane Connections and Installation RulesDFE-Platinum Series Hardware Installation Guide 3-3TheFTMbridgingmoduleshaveconnectionstobothFTM1

Page 21 - LANVIEW Diagnostic LEDs

Backplane Connections and Installation Rules3-4 InstallationExample 3 (Figure 3-1, C)Showschassisslots1through5populatedwithfirstandsecondg

Page 22 - 1-6 Introduction

Installing Module into Matrix E7 or Matrix N7 ChassisDFE-Platinum Series Hardware Installation Guide 3-5Installing Module into Matrix E7 or Matrix N7

Page 23 - Network Requirements

iNoticeEnterasys Networksreservestherighttomakechangesinspecificationsandotherinformationcontainedinthisdocumentanditswebsitewitho

Page 24 - 1000BASE-T Network

Installing Module into Matrix E7 or Matrix N7 Chassis3-6 InstallationInstallationToinstallthemodule,refertoFigure 3‐2andproceedasfollows:1.

Page 25 - Installation

Installing Module into Matrix E7 or Matrix N7 ChassisDFE-Platinum Series Hardware Installation Guide 3-7Figure 3-2 Installing Module into Matrix E7 o

Page 26 - FTM1 and FTM2 Connectivity

Installing Module into Matrix N1, N3, or N5 Chassis3-8 InstallationInstalling Module into Matrix N1, N3, or N5 ChassisADFEmodulecanbeinstalledin

Page 27 - Module Placement and Rules

Connecting to the NetworkDFE-Platinum Series Hardware Installation Guide 3-9Connecting to the NetworkThissectionprovidestheproceduresforconnecti

Page 28 - Example 6 (Figure 3-1, F)

Connecting to the Network3-10 InstallationFigure 3-4 Connecting a Twisted Pair Segment to the DFE-Platinum Module3. Verifythatalinkexistsbychec

Page 29 - Preparation

Connecting to the NetworkDFE-Platinum Series Hardware Installation Guide 3-11Figure 3-5 Crossover Four-Wire Cable RJ45 Pinouts, Connections Between H

Page 30

Connecting to COM Port for Local Management3-12 InstallationFigure 3-8 Eight-Wire Straight-Through Cable RJ45 Pinouts, Connections Between Switches a

Page 31 - 4 Metal back panel

Connecting to COM Port for Local ManagementDFE-Platinum Series Hardware Installation Guide 3-13Connecting to an IBM PC or Compatible DeviceToconnect

Page 32 - 3-8 Installation

Connecting to COM Port for Local Management3-14 InstallationConnecting to a VT Series TerminalToconnectaVTSeriesterminaltoanEnterasys Networks

Page 33 - Connecting to the Network

Connecting to Modem Connecting to COM Port for Local ManagementDFE-Platinum Series Hardware Installation Guide 3-15Connecting to a ModemToconnectam

Page 34 - Receive status (RX) LED

iiRegulatory Compliance InformationFederal Communications Commission (FCC) NoticeThisdevicecomplieswithPart15oftheFCCrules.Operationissubj

Page 35

Connecting to COM Port for Local Management Pin Out Descriptions3-16 InstallationAdapter Wiring and Signal AssignmentsCOM Port Adapter Wiring and Sign

Page 36 - What Is Needed

Pin Out Descriptions Completing the InstallationDFE-Platinum Series Hardware Installation Guide 3-17Completing the InstallationCompletingtheDFEmodu

Page 37 - 7G4202-72

Completing the Installation Pin Out Descriptions3-18 InstallationStarttheCommandLineInterface(CLI)fromthemodule’slocalconsoleportasfollow

Page 38 - 3-14 Installation

Pin Out Descriptions Completing the InstallationDFE-Platinum Series Hardware Installation Guide 3-19Completing the Installation of a DFE-Platinum Modu

Page 39 - Connecting to a Modem

Completing the Installation Pin Out Descriptions3-20 Installation

Page 40 - DB25 Connector (Female)

DFE-Platinum Series Hardware Installation Guide 4-14TroubleshootingThischapterprovidesinformationconcerningthefollowing:Unlessotherwisenoted,

Page 41 - Completing the Installation

Using LANVIEW4-2 TroubleshootingFigure 4-1 LANVIEW LEDsTable 4‐1describestheLEDindicationsandprovidesrecommendedactionsasappropriate.1 MGMT

Page 42 - 3-18 Installation

Using LANVIEWDFE-Platinum Series Hardware Installation Guide 4-3CPU None Power off. Ensure chassis has adequate power.Amber Blinking. Module in proces

Page 43 - Existing System

Troubleshooting Checklist4-4 TroubleshootingTroubleshooting ChecklistIfthemoduleisnotworkingproperly,refertoTable 4‐2forachecklistofprob

Page 44 - 3-20 Installation

Troubleshooting ChecklistDFE-Platinum Series Hardware Installation Guide 4-5User parameters (IP address, device and module name, etc.) were lost when

Page 45 - Troubleshooting

iiiElectromagnetic Compatibility (EMC)Thisproductcomplieswiththefollowing:47CFRParts2and15,CSAC108.8,2004/108/EC,EN55022,EN61000‐3‐2

Page 46 - Table 4-1 LANVIEW LEDs

Overview of DFE-Platinum Module Shutdown Procedure4-6 TroubleshootingOverview of DFE-Platinum Module Shutdown ProcedureTheDFEmodulesinstalledina

Page 47 - Using LANVIEW

Overview of DFE-Platinum Module Shutdown ProcedureDFE-Platinum Series Hardware Installation Guide 4-7Recommended Shutdown Procedure Using OFFLINE/RESE

Page 48 - Troubleshooting Checklist

Overview of DFE-Platinum Module Shutdown Procedure4-8 Troubleshooting

Page 49

DFE-Platinum Series Hardware Installation Guide A-1ASpecificationsThisappendixprovidesinformationaboutthefollowing:Enterasys Networksreservest

Page 50 - 4-6 Troubleshooting

COM Port Pinout AssignmentsA-2 SpecificationsCOM Port Pinout AssignmentsTheCOMportisaserialcommunicationsportforlocalaccesstoLocalManagem

Page 51

Regulatory ComplianceDFE-Platinum Series Hardware Installation Guide A-3Regulatory ComplianceThe7G4202‐72and7G4282‐49meetthesafetyandelectroma

Page 52 - 4-8 Troubleshooting

Regulatory ComplianceA-4 Specifications

Page 53 - Specifications

DFE-Platinum Series Hardware Installation Guide B-1BMode Switch Bank Settingsand Optional InstallationsThisappendixcoversthefollowingitems:Requir

Page 54 - COM Port Pinout Assignments

Memory Locations and Replacement ProceduresB-2 Mode Switch Bank Settings and Optional Installations•Switch7–ClearPersistentData.Changingthepos

Page 55 - Regulatory Compliance

Memory Locations and Replacement ProceduresDFE-Platinum Series Hardware Installation Guide B-3Location of DRAM SIMM and DIMM Memory ModulesFigure B‐2

Page 56 - A-4 Specifications

ivѻѻક䇈ᯢк䰘ӊSupplement to Product Instructions ᳝↦᳝ᆇ⠽䋼៪ܗ㋴(Hazardous Substance) 䚼ӊৡ⿄(Parts) 䪙3E∲+J䬝&G݁Ӌ䫀&U໮⒈㘨㣃3%%໮⒈Ѡ㣃䝮3%&apos

Page 57 - Mode Switch Bank Settings

Memory Locations and Replacement ProceduresB-4 Mode Switch Bank Settings and Optional InstallationsDIMM Replacement Procedure (7G4282-49 only) Removin

Page 58 - 1 2345678

Memory Locations and Replacement ProceduresDFE-Platinum Series Hardware Installation Guide B-5Figure B-5 Removing the Existing DIMM from 7G4282-493.

Page 59 - 2 DRAM SIMM 3 Main PC board

Memory Locations and Replacement ProceduresB-6 Mode Switch Bank Settings and Optional InstallationsDRAM SIMM Replacement Procedure for 7G4202-72 or 7G

Page 60

Memory Locations and Replacement ProceduresDFE-Platinum Series Hardware Installation Guide B-7Figure B-8 Installing the DRAM SIMM on 7G4202-72 or 7G4

Page 61

Memory Locations and Replacement ProceduresB-8 Mode Switch Bank Settings and Optional Installations

Page 62 - Removing the DRAM SIMM

Index-1IndexNumerics1000BASE-T network connectionsrequirements for 2-2100BASE-TXrequirements 2-210BASE-Tconnection 3-9requirements 2-27G4202-72introdu

Page 64

vVCCI NoticeThisisaclassAproductbasedonthestandardoftheVoluntaryControlCouncilforInterferencebyInformationTechnologyEquipment(VCC

Page 65

viDeclaration of ConformityApplicationofCouncilDirective(s): 2004/108/EC2006/95/ECManufacturer’sName: Enterasys Networks, Inc.Manufacturer’sAddre

Page 66 - Index-2

viishallnotbepermittedbythatapplicablelaw,suchrightsareexpresslyexcluded.Informationnecessarytoachieveinteroperabilityorcorrecterr

Comments to this Manuals

No comments